Laying Blocks for the Driveway Retaining Wall - 4/30/2003

On Wednesday, April 30th, the driveway retaining wall blocks were set. Before grouting, the steel needs to be inspected. After grouting, the wall needs to cure for about 7 days before soil can be back-filled.