Live Camera

Journal
Photos
POD
Design & Plans
In Retrospect
Contact Us
FAQ
Our Partners

Bridge and Entry Landing

Because of the challenges created by the slope of our lot, we designed the main entrance to be on the second floor with access via a bridge.


Excavating for footings (3/9/2004)



Landing footing and retaining wall

Footings as of 5/14/2004

Bridge support column

Bridge landing from the front doorway

6/16/2004




Front entry bridge