It took a long, long time to get this far,
but now we're hoping for some real progress. Green tagged on
4/14/2004, Insulation started on the 15th, and drywalling
started on Monday, 4/19. Finally, progress! Some of the pictures
have spots caused by flying insulation debris on the lens.
Lots of blood, sweat, tears and double-dosing ACE inhibitors to
get this.
Insulation blower
A stuck forklift
Moving drywall
Great room / dining room ceiling
Lots of debris
Mudding
Sometimes, the "Taker Outers" win. Repairing a little hump in the
wall.