Tile and Flooring

The tile preparation process began on 5/26/2004. Wood flooring installation was started on 7/22/2004.


Before we tile the master shower, the plumbers had to adjust the depth of the valves. Score 1 for the taker-outers (5/27/2004).

Mudded stair pans--much easier to walk on.
 

Master shower liner. Another layer of waterproofing goes over this.

mudding in the office shower.

Red Guard waterproofing and the start of the master shower surround.

Cutting tile



Marking lanai tile

Upper Lanai

Roof deck Red Guard and the start of the tile (5/9/2004)

Foyer

Jobsite dog inspects the lanai tile



Lanai - 6/16/2004

Master Shower - 6/18/2004

Shower Head Column

Greenhouse (with barricade)

Office Shower

Jet tub in bath 2





Initial floor sanding


Sanding the filler